Engineering LLP specializes in delivering innovative and efficient solutions for diverse industries. With a focus on precision and quality, we offer expert services in project design, development, and management. Our team collaborates closely with clients to ensure timely, cost-effective, and sustainable outcomes. From infrastructure to technology-driven projects, we bring expertise, reliability, and cutting-edge solutions to every project we undertake. Partner with us for successful engineering solutions tailored to your needs.
Network Survey Vehicle (NSV) survey for Four Laning of Gomati Chauraha-Udaipur Section of NH-8 (from Km. 177/100 to Km. 260/100) in the State of Rajasthan under NHDP Phase IV on DBFOT (Toll) basis; Client: NHAI; Total length: 83.100 Km; Lane: 4; Project Cost: INR 114.27 Crore (Conduct in December, 2020)
Network Survey Vehicle (NSV) survey for Four Laning of Gomati Chauraha-Udaipur Section of NH-8 (from Km. 177/100 to Km. 260/100) in the State of Rajasthan under NHDP Phase IV on DBFOT (Toll) basis; Client: NHAI; Total length: 83.100 Km; Lane: 4; Project Cost: INR 114.27 Crore (Conduct in September, 2021)
Network Survey Vehicle (NSV) Survey of project stretch which starts from Chainage 90+000 of NH-79 At Gulabpura and ends at Chainage 214+870 of NH-79 at Chittorgarh in the State of Rajasthan; Client: NHAI; Total length: 124.870 Km; Lane: 6; Project Cost: INR 1239.82 Crore (Conduct in August, 2021)
Network Survey Vehicle (NSV) Survey for (1) Four Laning of Chittorgarh-Kota Section of NH-27 from Km. 891.929 to Km. 1052.429 and (2) Four Laning of Rajsamand-Bhilwara Section of NH-758 from Km. 0.000 to Km. 87.250 in the State of Rajasthan; Client: NHAI; Total length: 247.75 Km; Lane: 4; Project Cost: INR 92.00 Crore (Chittorgarh-Kota) & INR 677.79 Crore (Rajsamand-Bhilwara) (Conduct in September, 2020)
Network Survey Vehicle (NSV) Survey for (1) Four Laning of Chittorgarh-Kota Section of NH-27 from Km. 891.929 to Km. 1052.429 and (2) Four Laning of Rajsamand-Bhilwara Section of NH-758 from Km. 0.000 to Km. 87.250 in the State of Rajasthan; Client: NHAI; Total length: 247.75 Km; Lane: 4; Project Cost: INR 92.00 Crore (Chittorgarh-Kota) & INR 677.79 Crore (Rajsamand-Bhilwara) (Conduct in June, 2021)
Detailed Engineering Design Consultancy Services for Up gradation to 2 lane with paved shoulder/ 4 lane of Gagaria – Baori Kalan – Serwa – Bakhasar Section of NH-925 (Design Chainage 0+000 to 136+520) and Sata – Gandhav Section of NH 925A (Design Chainage 0+000 to 60+450) (Total length 196.970 km) under Bharatmala Pariyojana in the State of Rajasthan on EPC Mode; Client: GHV (India) Pvt. Ltd. / NHAI; Total length: 197.69 Km (2 lane: 181.63 Km & 4 lane: 16.06 Km); Project Cost: INR 902.00 Crore
Pre-bid Engineering Services for Six lane access controlled Highway from Km 0.00 to Km 40.080 (Paniyala to Mator Section) of Paniyala – Barodameo ICR in the State of Rajasthan on EPC Mode under Bharatmala Pariyojana; Client: M/s Bharat Vanijya Eastern Pvt. Ltd.; Total length: 40.08 Km; Lane: 6; Project Cost: INR 1306.78 Crore
Pre-bid Engineering Services for Six lane access controlled Highway from Km 40.080 to Km 86.513 (Mator to Barodameo Section) of Paniyala – Barodameo ICR in the State of Rajasthan on EPC Mode under Bharatmala Pariyojana; Client: M/s Bharat Vanijya Eastern Pvt. Ltd.; Total length: 46.433 Km; Lane: 6; Project Cost: INR 1388.95 Crore
Pre-bid Engineering Services for Up gradation to 2 lane with paved shoulder/4 lane of Gagaria-Baori Kalan Serwa-Bakhasar section of NH-925 and Sata-Gandhav Section of NH 925A under Bharatmala Pariyojana in the State of Rajasthan on EPC mode; Client: GHV (India) Pvt. Ltd.; Total length: 197.69 Km (2 lane: 181.63 Km & 4 lane: 16.06 Km); Project Cost: INR 902.00 Crore
Pre-bid Engineering Services for Balance Works of Six Laning of Jaipur Ring Road between Agra Road and Ajmer Road Section in the State of Rajasthan on EPC Mode; Client: GHV (India) Pvt. Ltd.; Total length: 47 Km; Lane: 6; Project Cost: INR 959.50 Crore
Pre-bid Engineering Services for Four laning of Dangiawas to Jajiwal section Package-I (Design length 74.619 km) of Jodhpur Ring Road (In Principally declared NH) in the State of Rajasthan on Hybrid Annuity Mode under NHDP phase VII; Client: GHV (India) Pvt. Ltd.; Total length: 74.619 Km; Lane: 6; Project Cost: INR 1067.00 Crore
Pre-bid Engineering Services for Construction of Six lane Vadodara Kim Expressway from KM 292.00 to KM 323.00 (Manubar to Sanpa Section of Vadodara Mumbai Expressway) in the state of Gujarat under NHDP Phase IA on EPC Mode (Package III); Client: GHV (India) Pvt. Ltd.; Total length: 31 Km; Lane: 6; Project Cost: INR 1132.00 Crore
Pre-bid Engineering Services for Construction of Eight lane Vadodara Kim Expressway from Km 254.430 to Km 279.000 Kim to Ankleshwar Section of Vadodara Mumbai Expressway in the State of Gujarat under NHDP Phase IA on EPC mode (Package V); Client: GHV (India) Pvt. Ltd.; Total length: 24.57 Km; Lane: 6; Project Cost: INR 1745.00 Crore
Pre-bid Service for (a) Six Laning from Nidagatta- Mysore Section from Km 74.200 to Km 135.304 of NH-275 and (2) Six Laning from Bangalore –Nidagatta Section from Km 18.000 to Km 74.200 of NH-275 in the State Karnataka; Client: MTD Walkers-MMC JV; Total Length: 117 Km; Lane: 6; Project Cost: INR 2,425.69 Crore
Consultancy Services for Preparation of General Arrangement Drawing (GAD) of 3 Nos. ROB’s and getting approvals from Railway Authorities for Palia to Lucknow section of NH-731 in the State of Uttar Pradesh; Client: Wadia Techno-Engineering Services Ltd.; Length of ROB’s: 1107.502m, 970m, 1435m; Lane: 4; Project Cost: INR 146.04 Crore
Consultancy Service of Detail Design of Reconstruction & Rehabilitation Bituminous Pavement Works and Incidental Works of Deoli-Kota Section of NH-12 (New NH-52) from Km. 165.00 to Talabgaon Junction (Design Km. 167.624 to Km. 205.724) in the state of Rajasthan (Package-1) on item rate (percentage) basis; Client: M/s Murari Lal Agarwal; Total length: 38.1 Km; Lane: 4; Project Cost: INR 109.33 Crore
Providing technical manpower for Supervision of Major Maintenance / Routine Maintenance works on selected stretches of RIDCOR Roads in the State of Rajasthan; Client: RIDCOR Ltd. / SA Infrastructure Consultants Pvt. Ltd.
Supervision Consultant Services for Operation & Maintenance of i) Swaroopganj-Pindwara Section (Km. 248.700 to Km. 264.000) of NH-14 and Pindwara-Udaipur Section (Km 0.000 to Km. 104.724) of NH-76 and ii) Debari to Udaipur Section (Km. 118.500 to Km. 113.830) of NH-76, 11.20 Kms two lane existing Udaipur Bypass from Pratapnagar to Balicha and Udaipur to Kaya Section (Km. 278.000 to Km. 287.400) of NH-8 in the state of Rajasthan; Client: NHAI; Total length: 145.294 Km; Lane: 4; Project Cost: INR 1994.38 Crore
Preparation of Detailed Project Report of Upgradation of existing highway from 4-lane to 6-lane for the stretch of SH-25 from Tapukara to Bhiwadi in the State of Rajasthan; Client: RIDCOR; Total length: 8.30 Km; Lane: 6; Project Cost: INR 74.90 Crore
Pre-bid Engineering Services for Balance works of Rehabilitation and Upgradation to Four laning of NH-31D from Km 113.200 to Km 154.854 (Package –II A) Ghoshpukur – Salsalabari Section in the State of West Bengal on Engineering, Procurement and Construction (EPC) Mode; Client: Bharat Vanijya Eastern Pvt. Ltd.; Total length: 41.65 Km; Lane: 2; Project Cost: INR 766.67 Crore
Pre-bid Engineering Services for Development of 4 lane Economic Corridor from Kharagpur to Chandrakona-Ghatal Road Crossing section Km 0.000 to Km 41.000 section of NH-116A (Package-I) in the State of West Bengal under HAM mode; Client: Bharat Vanijya Eastern Pvt. Ltd.; Total length: 41 Km; Lane: 4; Project Cost: INR 984.86 Crore
Pre-bid Engineering Services for Development of 4 lane Economic Corridor from Guskara-Katwa Road to Mayurakshi Bridge Approach section Km 133.000 to Km 180.000 of NH 116A (Pkg-IV) in the state of West Bengal on Hybrid Annuity Mode; Client: Bharat Vanijya Eastern Pvt. Ltd.; Total length: 47 Km; Lane: 4; Project Cost: INR 1039.26 Crore
Pre-bid Engineering Services for Development of 4 lane Economic Corridor from Before Mayurakshi Bridge Approach to Moregram section Km 180.000 to Km 230.957 of NH 116A (Package-5) in the state of West Bengal under HAM Mode; Client: Bharat Vanijya Eastern Pvt. Ltd.; Total length: 50.957 Km; Lane: 4; Project Cost: INR 1226.91 Crore
Independent Engineer services for during Operation and Maintenance of Chomu- Chandwaji Highway Project section of SH-08 B from Km.0.00 to Km 15.450 and Hanumangarh to Abohar (upto Punjab Border) section of SH-7A from Km 0.00 to km. 42.655 augmented to Two Lane/Two lane Plus on design, build, finance, operate and transfer (“DBFOT”) basis in the State of Rajasthan; Client: PWD, Govt. of Rajasthan; Total length: 58.105 Km; Lane: 2; Project Cost: INR 91.50 Crore
Falling Weight Deflectometer (FWD) Survey for Independent Engineer Services during Operation & Maintenance stage of (1) Four laning of Jaipur-Reengus Section of NH-11 (New NH-52) from Km 246.300 to Km 298.075 on BOT (Toll) basis on DBFOT pattern under NHDP Phase-III (Length: 51.842 KM) [UPC : N/05038/1001/RJ] (2) Four laning of Reengus-Sikar section of NH-11 (New NH-52) from Km 298.075 to Km 341.962 of NH-11 (New NH 52) on BOT (Annuity) basis on DBFOT pattern under NHDP Phase-III (Length : 43.887 KM) [UPC:N/05038/2001/RJ] and (3) Two laning with paved shoulder of Salasar-Nagaur Section of NH-65 (New NH-58) from Design chainage Km 151+141 to 270+735 on Hybrid Annuity Mode under NHDP Phase-IV (Length : 119.594 KM) in the State of Rajasthan [UPC : N/08004/5001/RJ]; Client: Feedback Infra Pvt. Ltd.; Total length: 215.323 Km (4 lane: 95.729 Km & 2 lane : 119.594 Km)
Network Survey Vehicle (NSV) Survey for Independent Engineer Services during Operation & Maintenance stage of (1) Four laning of Jaipur-Reengus Section of NH-11 (New NH-52) from Km 246.300 to Km 298.075 on BOT (Toll) basis on DBFOT pattern under NHDP Phase-III (Length: 51.842 KM) [UPC : N/05038/1001/RJ] (2) Four laning of Reengus-Sikar section of NH-11 (New NH-52) from Km 298.075 to Km 341.962 of NH-11 (New NH 52) on BOT (Annuity) basis on DBFOT pattern under NHDP Phase-III (Length : 43.887 KM) [UPC:N/05038/2001/RJ] and (3) Two laning with paved shoulder of Salasar-Nagaur Section of NH-65 (New NH-58) from Design chainage Km 151+141 to 270+735 on Hybrid Annuity Mode under NHDP Phase-IV (Length : 119.594 KM) in the State of Rajasthan [UPC : N/08004/5001/RJ]; Client: Feedback Infra Pvt. Ltd.; Total length: 215.323 Km (4 lane: 95.729 Km & 2 lane : 119.594 Km)
Falling Weight Deflectometer (FWD) Survey for Independent Engineer Services during Operation & Maintenance stage of (1) Four laning of Jaipur-Reengus Section of NH-11 (New NH-52) from Km 246.300 to Km 298.075 on BOT (Toll) basis on DBFOT pattern under NHDP Phase-III (Length: 51.842 KM) [UPC : N/05038/1001/RJ] (2) Four laning of Reengus-Sikar section of NH-11 (New NH-52) from Km 298.075 to Km 341.962 of NH-11 (New NH 52) on BOT (Annuity) basis on DBFOT pattern under NHDP Phase-III (Length : 43.887 KM) [UPC:N/05038/2001/RJ] and (3) Two laning with paved shoulder of Salasar-Nagaur Section of NH-65 (New NH-58) from Design chainage Km 151+141 to 270+735 on Hybrid Annuity Mode under NHDP Phase-IV (Length : 119.594 KM) in the State of Rajasthan [UPC : N/08004/5001/RJ]; Client: Feedback Infra Pvt. Ltd.; Total length: 215.323 Km (4 lane: 95.729 Km & 2 lane : 119.594 Km)
Network Survey Vehicle (NSV) Survey for Independent Engineer Services during Operation & Maintenance stage of (1) Four laning of Jaipur-Reengus Section of NH-11 (New NH-52) from Km 246.300 to Km 298.075 on BOT (Toll) basis on DBFOT pattern under NHDP Phase-III (Length: 51.842 KM) [UPC : N/05038/1001/RJ] (2) Four laning of Reengus-Sikar section of NH-11 (New NH-52) from Km 298.075 to Km 341.962 of NH-11 (New NH 52) on BOT (Annuity) basis on DBFOT pattern under NHDP Phase-III (Length : 43.887 KM) [UPC:N/05038/2001/RJ] and (3) Two laning with paved shoulder of Salasar-Nagaur Section of NH-65 (New NH-58) from Design chainage Km 151+141 to 270+735 on Hybrid Annuity Mode under NHDP Phase-IV (Length : 119.594 KM) in the State of Rajasthan [UPC : N/08004/5001/RJ]; Client: Feedback Infra Pvt. Ltd.; Total length: 215.323 Km (4 lane: 95.729 Km & 2 lane : 119.594 Km)
Consultancy Services for Preparation of Feasibility cum Preliminary Design for Construction of Jaipur Ring Road North from Km. 101.000 to Km. 145.100 connecting NH-48 (at Km. 236+730) to NE-4C (at Km. 64.350) in the state of Rajasthan; Client: Upham International Corporation; Total 43.9 Km; Lane: 6; Project Cost: INR 2947.00 Crore
Consultancy Services for Planning, Proposed Plan, Section and Elevation drawing, Estimation and specification of All New Panchayat Samiti’s Buildings in Rajasthan State; Client: Govt. of Rajasthan; Project Cost: INR 60.00 Crore
Safety Consultant Services during Operation and Maintenance of Six-Lane Access Controlled Greenfield Highway (NH-152D) starting from Ismailabad (Gangheri) on NH-152D to Narnual [Ch. 0+000 to Ch. 227+020, length 227.20 Km] for Pkg-1 to Pkg-8 on EPC mode under Bharatmala Pariyojana in the state of Haryana; Client: NHAI; Total length: 227.20 Km; Lane: 6; Project Cost: INR 6,416.95 Crore
Safety Consultant for Operation & Maintenance for Design, Engineering, Construction, Development, Finance, Operation and Maintenance of Jhansi-Lalitpur section from km 00/000 to km 99/005 of NH-26 (New NH-44) apart of North-South Corridor in the State of Uttar Pradesh under NHDP Phase-II on Build, Operate and Transfer (BOT) (Annuity) basis; Client: NHAI; Total length: 99.005 Km; Lane: 4; Project Cost: INR 631.15 Crore
Consultancy Services for conducting Third Party Road Safety Audit as per IRC SP 88:2019 of the project “2 lanned Hansi to Barwala section of NH-148B from existing Km 163.468 to Km 197.270 in the State of Haryana” – as 2 lane in O&M stage; Client: NHAI; Total length: 33.802 Km; Lane: 2
Consultancy Services & preparation of detailed project report with third party Road Safety Audit for the works of Construction of flyover at Km 173 (RIICO Junction) on NH-62 Nagaur-Bikaner section in the State of Rajasthan; Client: PWD, Govt. of Rajasthan; Total length of flyover: 1.76 Km; Lane: 4; Project Cost: INR 38.78 Crore
Appointment of Safety Consultant for Short Term Improvement & Routine Maintenance of Two-Lane with paved shoulders of Jaisalmer-Barmer Km 0.00 to Km 122.880 & Km 144.500 to Km 153.034 of NH-68 in the State of Rajasthan (Length: 131.414 Km) and Short Term Improvement & Routine Maintenance of 2/4 lane with paved shoulders from Km 153.00 to Km 259.300 along with Incident Management Services from Km 259.300 to 297.200 of Barmer-Gandhav Bridge-Sanchor-upto Gujarat Border section of NH-68 in the State of Rajasthan (Lenth 106.30 Km) and Overlay / Strengthening work of Gandhav Bridge to Gujarat Border of NH-68 from Km 259.300 to Km 297.200 in the State of Rajasthan (Length 37.9 Km); Client: NHAI; Total length: 275.614 Km; Lane: 2/4; Project Cost: INR 674.49 Crore
Appointment of Safety Consultant for 4 laning of Rudrapur Bypass from Km 0.00 to Km 21.476 (Length 20.64) and Kashipur Bypass section of NH-734 from Km 38.770 (at UP/UK Border) to Km 53.260 (existing Km 5.560 of NH-309) (Length 14.49) and Four/Six laning of Bhaniyawala-Jollygrant-Rishikesh spur section of NH-07 from Km 0.000 to Km 19.780 (Length 19.78 Km) and Development of Jhajra-Asharori Link Road (Design Ch. 0.050 to Ch. 12.220) (Length 12.17 Km) in the State of Uttarakhand; Client: NHAI; Total length: 67.08 Km; Lane: 4/6; Project Cost: INR 3,465.71 Crore
Appointment of Safety Consultant for “Construction of 6-lane access controlled Greenfield highway from Km 88.000 to Km 115.000 of Sangaria (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-04) (Length: 27 Km)” and “Construction of 6-lane access controlled Greenfield highway from Km 115.000 to Km 140.000 of Sangaria (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-05) (Length 25 Km.)” and “Construction of 6-lane access controlled Greenfield highway from Km 200.000 to Km 225.000 of Sangariya (near Chautala)-Rasisar (near Bikaner) section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I) (AJ/SR-Package-08) (Length: 25 Km)” – Under O&M Stage; Client: NHAI; Total length: 77 Km; Lane: 6; Project Cost: INR 1,196.03 Crore
Appointment of Safety Consultant for “Sagar Kabarai Economic Corridor Mohari to Satai Ghat section of NH-934 from Km 50.300 to Km 89.875 (Package-2) in the State of Madhya Pradesh on EPC mode (Length: 39.575 Km)” and “4-laning of Sagar to Mohari section of NH-934 from Design Km 8.000 to Km 50.300 under Bharatmala Pariyojana Phase-I (Economic Corridor category) on EPC mode in the State of Madhya Pradesh (Length: 42.30 Km)” and “Construction of 4-lane Greenfield highway from Km 134.737 to Km 163.253 (Sagar Link Road – Berkhedi-Sagar) under Bharatmala Priyojana in the State of Madhya Pradesh on EPC mode (Length: 28.516 Km)” and “Construction of 4 lane divided carriageway with paved shoulder from Km 0.000 to Km 41.210 (Balaghat-Gondia section) of NH-543 under Bharatmala Pariyojana in the State of Madhya Pradesh & Maharashtra on EPC mode (Length: 41.21 Km)” – Under Construction Stage; Client: NHAI; Total length: 151.601 Km; Lane: 4
Consultancy Services for preparation of Detailed Project Report for Nagari (Chittorgarh-Kota Section of NH-27) to Medikheda fatak (Gulabpura-Chittorgarh Section of NH-48) in the State of Rajasthan; Client: MSV International Inc. / NHAI; Total length: 10 Km; Lane: 4
Consultancy Services for Preparation of Detailed Project Report for 4/6 Lane Green Field Expressways in the State of Rajasthan [Bikaner Kotputli Expressway (Package-3)]; Client: PWD, Govt. of Rajasthan; Total length: 295 Km; Lane: 4/6; Project Cost: INR 6,301.00 Crore
Consultancy Services for Preparation of Detailed Project Report for 4/6 Lane Green Field Expressways in the State of Rajasthan [Jaipur Phalodi Expressway (Package-7)]; Client: PWD, Govt. of Rajasthan; Total length: 345 Km; Lane: 4/6; Project Cost: INR 7,086.00 Crore
Consultancy Services for Preparation of Detailed Project Report for Construction of Four Lane Road Mandal-Haripura Chouraha to Devgarh section of SH-61 in the State of Rajasthan; Client: PWD, Govt. of Rajasthan; Total length: 62 Km; Lane: 4/6
Consultancy Services for Preparation of Detailed Project Report and Feasibility Report of Bypasses at Sawaimadhopur with Tunnel/Elevated as required and Chhan, Allahapur, Behramda Khurd, 17 Mile etc. on NH 552 Extn. in State of Rajasthan; Client: PWD, Govt. of Rajasthan; Total length: 18 Km; Lane: 2
Preparation of Detailed Design of Drainage for 6.50 Km of Mathura to Bharatpur road stretch in the State of Rajasthan; Client: RIDCOR Ltd.; Total length: 6.50 Km